Difference between revisions of "WormBase-Caltech Weekly Calls"

From WormBaseWiki
Jump to navigationJump to search
m (Replaced content with '2009 Meetings ==2011 Meetings== February [[WormBase-Caltech_Weekly_Calls_March_2011…')
m
Line 19: Line 19:
  
 
[[WormBase-Caltech_Weekly_Calls_September_2011|September]]
 
[[WormBase-Caltech_Weekly_Calls_September_2011|September]]
 +
 +
 +
 +
== October 6, 2011 ==
 +
 +
SVM
 +
*SVM Manuscript in process of resubmission
 +
*Messy procedures in place; needs to be cleaned up
 +
*Yuling able to get pipeline running from beginning to the end
 +
*May take longer than previously expected to get up and running
 +
*FlyBase has code running for SVM
 +
*Yuling should contact FlyBase to make sure they're OK, once he has WormBase SVM working
 +
*SGD would like to incorporate SVM into they're database
 +
*Yuri would work on SGD SVM, ultimately

Revision as of 16:32, 6 October 2011

2009 Meetings


2011 Meetings

February

March

April

May

June

July

August

September


October 6, 2011

SVM

  • SVM Manuscript in process of resubmission
  • Messy procedures in place; needs to be cleaned up
  • Yuling able to get pipeline running from beginning to the end
  • May take longer than previously expected to get up and running
  • FlyBase has code running for SVM
  • Yuling should contact FlyBase to make sure they're OK, once he has WormBase SVM working
  • SGD would like to incorporate SVM into they're database
  • Yuri would work on SGD SVM, ultimately