Difference between revisions of "WebDev 2010.02.10-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchLine 21: | Line 21: | ||
For today's review: | For today's review: | ||
* [[Design_Specs:_Database_Connectivity|Database Connectivity]] | * [[Design_Specs:_Database_Connectivity|Database Connectivity]] | ||
− | + | - | |
− | |||
* [[Design_Specs:_API|API]] | * [[Design_Specs:_API|API]] |
Revision as of 17:09, 10 February 2010
Contents
Agenda
1. Administrative Update (Todd; 5 minutes)
- WS210 polish up work
- GBrowse 2
- Frozen release WS210
2. Design Specifications Review (All; 25 minutes)
Reference Materials
- Work/expertise divided up for various facets of the effort
- Educate and train everyone else
- Links provided below:
For today's review:
-