WebDev 2010.02.10-Agenda and Minutes

From WormBaseWiki
Jump to navigationJump to search

Agenda

1. Administrative Update (Todd; 5 minutes)

  • WS210 polish up work
  • GBrowse 2
  • Frozen release WS210

2. Design Specifications Review (All; 25 minutes)

Reference Materials

  • Work/expertise divided up for various facets of the effort
  • Educate and train everyone else
  • Links provided below:

Rearchitecture design stages

Design Specifications

  • Currently 11 areas

For today's review:

-- Database Connectivity

  • XS area...
  • Use Moose
  • Reorganize the code a little bit
  • Every DB is considered a service; all of which implements a "connect" method
  • Address configuration issues for DBs and servers

-- API

  • Set up issues table
  • Will test ideas with current case
  • LS suggestions

-- Application Configuration

  • AC area
  • Building up more background
  • Configuration examples discussed: Apache, and MS I&I

-- Application Request Flow

  • Working on Ideas
  • REST URIs -- question of granularity

--

3. WS211 Update status (Norie, 10 minutes)

  • nearly done
  • to commit modified code

4. Open Table