Difference between revisions of "WebDev 2010.07.14-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchLine 11: | Line 11: | ||
=== Phenotype page prototype and scrollable table (Xq; 5 minutes)=== | === Phenotype page prototype and scrollable table (Xq; 5 minutes)=== | ||
http://wb-dev.oicr.on.ca:8091/reports/phenotype/WBPhenotype:0000039/?view=page | http://wb-dev.oicr.on.ca:8091/reports/phenotype/WBPhenotype:0000039/?view=page | ||
+ | |||
+ | JQuery plugins for table manipulation | ||
+ | [http://www.datatables.net/index DataTables] | ||
+ | [http://www.trirand.com/blog/jqgrid/jqgrid.html jqgrid] | ||
+ | [http://tablesorter.com/docs/example-ajax.html tablesorter] | ||
=== Javascript infrastructure (Xq; 5 minutes) === | === Javascript infrastructure (Xq; 5 minutes) === |
Revision as of 19:52, 14 July 2010
Contents
Agenda
Administrative Update (Todd, 5 minutes)
WS216 staging status (Norie; 5 minutes)
BioMart update (Abby; 5 minutes)
New site discussion
Phenotype page prototype and scrollable table (Xq; 5 minutes)
http://wb-dev.oicr.on.ca:8091/reports/phenotype/WBPhenotype:0000039/?view=page
JQuery plugins for table manipulation DataTables jqgrid tablesorter
Javascript infrastructure (Xq; 5 minutes)
Linking mechanism update (Abby; 5 minutes)
Proposed areas of expertise (Todd; 10 minutes)
- CSS
- Javascript
- Configuration
- Testing: View
- Testing: App
- Deployment
- API: Coding standards
Define Milestones
Present - July 30th
- Coding standards and best practices for CSS, Javascript, API in place
- Release new pages to production powered by the new architecture (classic view only)
July 30th - August 31st
- Finish API development of critical classes
- Finish migration of prominent CGI-based pages to new architecture and release into production (classic view only)
- Solidify look-and-feel of new site: site map, browsing paths, design patterns, navigation
September 1st
- Begin beta testing of new site to invited parties
October 1st - November 1st
- Begin public beta testing of new site
- Launch UI and general surveys.
November 1st - December 1st
- Address survey issues
- Test, test, test
December 1st
- Go Live with new site