Difference between revisions of "WebDev 2009.11.04-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to search (New page: =Agenda= == 1. WS208 data update; remanei blast databases(Norie; 10 minutes) == == 2. Sam/Bam, GBrowse2, modENCODE (Abby; 10 mins) == == 3. Pathway integration (Xiaoqi; 10 mins) == == 4. ...) |
|||
(6 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
== 1. WS208 data update; remanei blast databases(Norie; 10 minutes) == | == 1. WS208 data update; remanei blast databases(Norie; 10 minutes) == | ||
+ | |||
+ | |||
+ | * WS208 data update in the works | ||
+ | * Discussion of Paralog sections; need to check annotation differences between gene and paralog for sibling/descendant relationship | ||
+ | * Look into Reference Genome Annotation projects for use in paralog section | ||
+ | * Add TreeFam data | ||
+ | * Provide filter for orthologs via species | ||
+ | |||
== 2. Sam/Bam, GBrowse2, modENCODE (Abby; 10 mins) == | == 2. Sam/Bam, GBrowse2, modENCODE (Abby; 10 mins) == | ||
+ | |||
+ | * install GB2 into personal development space; unfortunately GB1 kept breaking; LS will help with install | ||
+ | * Waiting for help from TH | ||
+ | |||
== 3. Pathway integration (Xiaoqi; 10 mins) == | == 3. Pathway integration (Xiaoqi; 10 mins) == | ||
+ | |||
+ | * Discussion of pathway page, incorporation of information via WormMart | ||
+ | |||
== 4. WormMart (Zheng; 5 mins) == | == 4. WormMart (Zheng; 5 mins) == | ||
+ | |||
+ | |||
+ | * WormMart 200 in the works to be ready this week |
Latest revision as of 17:46, 4 November 2009
Contents
Agenda
1. WS208 data update; remanei blast databases(Norie; 10 minutes)
- WS208 data update in the works
- Discussion of Paralog sections; need to check annotation differences between gene and paralog for sibling/descendant relationship
- Look into Reference Genome Annotation projects for use in paralog section
- Add TreeFam data
- Provide filter for orthologs via species
2. Sam/Bam, GBrowse2, modENCODE (Abby; 10 mins)
- install GB2 into personal development space; unfortunately GB1 kept breaking; LS will help with install
- Waiting for help from TH
3. Pathway integration (Xiaoqi; 10 mins)
- Discussion of pathway page, incorporation of information via WormMart
4. WormMart (Zheng; 5 mins)
- WormMart 200 in the works to be ready this week