Difference between revisions of "WebDev 2009.10.14-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 27: Line 27:
  
 
== 4. modENCODE data migration update (Abby; 10 minutes) ==
 
== 4. modENCODE data migration update (Abby; 10 minutes) ==
 +
 +
* Working on Track Sharing.
 +
* Software updates necessary: bioperl and biographics.
 +
* modENCODE site needs updating as well.
 +
* Other data files to be looked into; Lieb data works well.
 +
* Wait on modENCODE updates till next week, Lied data to be released for WS207
 +
* Operon Summa page:  Pheno2GO mappings section? -- 2 Do some analysis
  
 
== 5. Define WormMart schedule (Zheng; 10 minutes) ==
 
== 5. Define WormMart schedule (Zheng; 10 minutes) ==

Revision as of 16:38, 14 October 2009

Agenda

1. Administration (Todd; 5 minutes)

  • resubmitted NAR paper
  • Server maintenance @ CSHL
  • WS207 into production
  • Established a series of machines @ OICR

2. Discuss WS207 build status (Norie; 10 minutes)

Build is coming along

  • Working on load GFF steps
  • Added some new modules for the build
    • Gene resources compile and ortholog data compile
  • Built contortus
  • Going through the checklist for WS207
  • Working on paralogs not ready for WS207

3. Process and Pathway Visualization update (Xiaoqi; 10 minutes)

  • Created subsection in Gene page for pathway with ReacTome data. Example in XS personal dev site
  • Waiting for system reconfiguration to enable pulling data from ReacTome.
  • Looking into creation of separate page for rxns.
  • Question re: Karen's data; we're waiting for the details
  • Looking into Phenotype info table issues

4. modENCODE data migration update (Abby; 10 minutes)

  • Working on Track Sharing.
  • Software updates necessary: bioperl and biographics.
  • modENCODE site needs updating as well.
  • Other data files to be looked into; Lieb data works well.
  • Wait on modENCODE updates till next week, Lied data to be released for WS207
  • Operon Summa page: Pheno2GO mappings section? -- 2 Do some analysis

5. Define WormMart schedule (Zheng; 10 minutes)

6. Discuss scheduling and calendar (5 minutes)

7. Open Table