Difference between revisions of "Issues-11/5/2013"
From WormBaseWiki
Jump to navigationJump to search (Summary of R visualization progress.) |
(Summary of WormMine WS239-2 build progress.) |
||
Line 12: | Line 12: | ||
== Intermine == | == Intermine == | ||
+ | |||
+ | * WS239-2 build finished | ||
+ | * made space on production and loaded build into its own database | ||
+ | * '''have not''' fired up an InterMine instance on that data yet | ||
+ | * summary of time/space requirements summarized at http://wiki.wormbase.org/index.php/Website:WormMine_Builds | ||
= Abby = | = Abby = |
Revision as of 15:39, 5 November 2013
All meetings: WebDev Issues Meetings
Status updates
Contents
Joachim
Data Visualization - R
- stable implementation; merging with staging
- leaving no clutter: tmp files are properly cleared, keeps directory with previously generated images
- grouping by projects which removes need for color usage and provides better overview across projects
- image height is adjusted based on number of projects
Intermine
- WS239-2 build finished
- made space on production and loaded build into its own database
- have not fired up an InterMine instance on that data yet
- summary of time/space requirements summarized at http://wiki.wormbase.org/index.php/Website:WormMine_Builds
Abby
Search (Xapian)
- Don't always shorten species to g_species - if not recognized, shorten to genus_species
- disambiguation between all the different c_elegans.
- #1795
- added more info to RNAi
Mobile Site
- m.wormbase.org
- being tested by curators
- slow - they take that to mean not working sometimes
- will address issues this week