Difference between revisions of "WBConfCall 2015.02.5-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to search(8 intermediate revisions by 4 users not shown) | |||
Line 9: | Line 9: | ||
===Topics=== | ===Topics=== | ||
− | WormMine | + | |
+ | ===== Release schedule for IWM 2015 ===== | ||
+ | |||
+ | WS247 is due on ftp.sanger mid-Feb, so public mid of April (cycle shifted due to 2014 holidays). If we want WS248 to be live at the meeting, we should be aiming for it to go live by early-mid June. This implies an freeze/upload window of end-Feb to mid-March. Precise dates to be discussed. | ||
+ | |||
+ | If we want it live the whole of June we can have a short cycle between 247 and 248 | ||
+ | |||
+ | WebTeam needs at least two weeks from time of release to making it available on the production architecture | ||
+ | |||
+ | GO annotation model the biggest model change for 248, | ||
+ | *require at the minimum a new table, other changes could wait for subsequent releases | ||
+ | *a new GO association gaf file would also be needed (Kevin and Kimberly will work on it> | ||
+ | |||
+ | <pre> | ||
+ | 13th Feb Models deadline | ||
+ | 20th Feb Models Tag | ||
+ | <citace upload to Wen due Tuesday 3rd of Mar> | ||
+ | 6th Mar Data upload | ||
+ | 3rd April 248 FTP'd Hinxton | ||
+ | 1st May 248 Staging | ||
+ | 1st June 248 Live | ||
+ | </pre> | ||
+ | |||
+ | So as Kevin said there is a sliding 3/4 week window to be decided. | ||
+ | |||
+ | ===== WormMine ===== | ||
+ | *Mary Ann: user requested query not able to be done through WormMine and still needs curator to pull it out of ACeDB. | ||
+ | *Todd: new developer Paolo N. working on automated process for updating WormMine, after that is done, webteam will look at and load in datatypes that still need to be added and catch up with existing git issues | ||
+ | *Mary Ann: very willing to help Paolo develop user guidelines on using WormMine when team is ready | ||
+ | *Todd: WormMine interface is not under WormBase control, interface and usability will probably be discussed at the InterMine meeting coming up soon and will hopefully address user interface | ||
+ | *Todd: model changes and tags that alter data integration can break the WormMine build and interface |
Latest revision as of 16:55, 5 February 2015
Contents
Agenda and minutes
help desk issues
- https://github.com/WormBase/website/issues/3569 Ranking C. elegans neuron popularity by page hits
Topics
Release schedule for IWM 2015
WS247 is due on ftp.sanger mid-Feb, so public mid of April (cycle shifted due to 2014 holidays). If we want WS248 to be live at the meeting, we should be aiming for it to go live by early-mid June. This implies an freeze/upload window of end-Feb to mid-March. Precise dates to be discussed.
If we want it live the whole of June we can have a short cycle between 247 and 248
WebTeam needs at least two weeks from time of release to making it available on the production architecture
GO annotation model the biggest model change for 248,
- require at the minimum a new table, other changes could wait for subsequent releases
- a new GO association gaf file would also be needed (Kevin and Kimberly will work on it>
13th Feb Models deadline 20th Feb Models Tag <citace upload to Wen due Tuesday 3rd of Mar> 6th Mar Data upload 3rd April 248 FTP'd Hinxton 1st May 248 Staging 1st June 248 Live
So as Kevin said there is a sliding 3/4 week window to be decided.
WormMine
- Mary Ann: user requested query not able to be done through WormMine and still needs curator to pull it out of ACeDB.
- Todd: new developer Paolo N. working on automated process for updating WormMine, after that is done, webteam will look at and load in datatypes that still need to be added and catch up with existing git issues
- Mary Ann: very willing to help Paolo develop user guidelines on using WormMine when team is ready
- Todd: WormMine interface is not under WormBase control, interface and usability will probably be discussed at the InterMine meeting coming up soon and will hopefully address user interface
- Todd: model changes and tags that alter data integration can break the WormMine build and interface