Difference between revisions of "WebDev 2013.10.25-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchLine 18: | Line 18: | ||
= Minutes = | = Minutes = | ||
− | == 1. | + | == 1. Administrative Update (Todd; 5 minutes) == |
* 240 build underway | * 240 build underway | ||
− | == 2. | + | == 2. InterMine handover status (JD, Joachim;15 minutes) == |
+ | * slowly, still haven't built everything | ||
+ | * bugs and other issues fixed along the way | ||
+ | * currently hanging for Joachim | ||
+ | ** JD unsure of problem - never seen this | ||
+ | |||
+ | * JD: all code committed and available to Joachim | ||
+ | ** committed progress on orthology work | ||
+ | |||
+ | |||
+ | == 3. InterMine status (JD; 10 minutes) == | ||
+ | * WS239 mine has been released, but I have discovered duplicate records caused by the addition of new species. The configuration has been updated, but a new build must be compiled. Until then, the mine will be rolled back to WS238. | ||
+ | * The process of automating second-degree ( record -> middleman record -> annotation ) is 50-75% done. Branch "upgrade-loader" contains work and can be found on git. | ||
+ | |||
+ | == 4. Discuss WS239 issues (all; 10 minutes) == | ||
+ | * location hotfix ready | ||
+ | |||
+ | == 5. Define WS240 plans (all; 15 minutes) == | ||
+ | |||
+ | == 6. Open Table (all; 5 minutes) == |
Revision as of 15:11, 25 October 2013
Agenda
1. Administrative Update (Todd; 5 minutes)
2. InterMine handover status (JD, Joachim;15 minutes)
http://wiki.wormbase.org/index.php/Administration:Installing_WormMine
3. InterMine status (JD; 10 minutes)
- WS239 mine has been released, but I have discovered duplicate records caused by the addition of new species. The configuration has been updated, but a new build must be compiled. Until then, the mine will be rolled back to WS238.
- The process of automating second-degree ( record -> middleman record -> annotation ) is 50-75% done. Branch "upgrade-loader" contains work and can be found on git.
4. Discuss WS239 issues (all; 10 minutes)
- location hotfix ready
5. Define WS240 plans (all; 15 minutes)
6. Open Table (all; 5 minutes)
Minutes
1. Administrative Update (Todd; 5 minutes)
- 240 build underway
2. InterMine handover status (JD, Joachim;15 minutes)
- slowly, still haven't built everything
- bugs and other issues fixed along the way
- currently hanging for Joachim
- JD unsure of problem - never seen this
- JD: all code committed and available to Joachim
- committed progress on orthology work
3. InterMine status (JD; 10 minutes)
- WS239 mine has been released, but I have discovered duplicate records caused by the addition of new species. The configuration has been updated, but a new build must be compiled. Until then, the mine will be rolled back to WS238.
- The process of automating second-degree ( record -> middleman record -> annotation ) is 50-75% done. Branch "upgrade-loader" contains work and can be found on git.
4. Discuss WS239 issues (all; 10 minutes)
- location hotfix ready