Difference between revisions of "WebDev 2013.09.27-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to search (Created page with '=Agenda = ==1. Administrative update (Todd; 10 minutes) == * WS239 in prebake * App updates still okay * WS240 dates * Jenkins instance issues == 2. WS239 development status (…') |
|||
Line 6: | Line 6: | ||
* App updates still okay | * App updates still okay | ||
* WS240 dates | * WS240 dates | ||
+ | ** upload deadline | ||
+ | ** build starts next week | ||
+ | ** released by Hinxton Oct 25 | ||
* Jenkins instance issues | * Jenkins instance issues | ||
== 2. WS239 development status (all; 10 minutes) == | == 2. WS239 development status (all; 10 minutes) == | ||
+ | * briggsae db bioproject id fix | ||
+ | * hold off on GFF3 | ||
== 3. Intermine development update (JD; 10 minutes) == | == 3. Intermine development update (JD; 10 minutes) == | ||
+ | * added rnai | ||
+ | * expanded classes | ||
+ | * gff3 loaded | ||
+ | * fasta loaded | ||
+ | * finished 3/4 orthologies - not in this build | ||
+ | ** will be able to load orthologies on top of everything | ||
+ | * build currently running | ||
+ | ** ETA: at least 1.5 days | ||
+ | ** mappings are expanded, will be longer (significantly) | ||
== 4. Intermine development restructuring (all; 10 minutes) == | == 4. Intermine development restructuring (all; 10 minutes) == | ||
+ | * granted leave of absence | ||
+ | ** pursue US citizenship | ||
+ | ** will return after 6 months | ||
+ | ** planning on remaining on wormbase as volunteer and handling intermine issues | ||
+ | |||
+ | * bring joachim on to intermine development | ||
+ | ** need distributed experience | ||
+ | ** need experience in-house | ||
+ | |||
+ | * plan: Have Joachim work through build process with 239 | ||
+ | * 1) Joachim can work through process - see how difficult it is to pick up | ||
+ | * 2) Refine process | ||
+ | |||
+ | * 1 month to get accustomed - JB | ||
+ | |||
+ | * JD will help Joachim along. | ||
+ | |||
+ | * doing the build - JD not sure if Hinxton is in a position to handle the build | ||
+ | ** doesn't think it's in a position to transfer to them | ||
== 5. GFF3 development status (10 minutes) == | == 5. GFF3 development status (10 minutes) == | ||
+ | * wait till new GFF3 from Kevin | ||
+ | * JB - stopped looking at GFF3 for now | ||
+ | ** visualizations | ||
+ | * Documentation - spreadsheet | ||
+ | ** take all source/type - populate spreadsheet | ||
== 6. Mobile app update (Abby; 5 minutes) == | == 6. Mobile app update (Abby; 5 minutes) == | ||
+ | http://wiki.wormbase.org/index.php/Developer_documentation#The_Mobile_Website | ||
+ | Goal: Get mobile website up for WS240 | ||
== 7. Open Table == | == 7. Open Table == |
Revision as of 15:35, 27 September 2013
Contents
- 1 Agenda
- 1.1 1. Administrative update (Todd; 10 minutes)
- 1.2 2. WS239 development status (all; 10 minutes)
- 1.3 3. Intermine development update (JD; 10 minutes)
- 1.4 4. Intermine development restructuring (all; 10 minutes)
- 1.5 5. GFF3 development status (10 minutes)
- 1.6 6. Mobile app update (Abby; 5 minutes)
- 1.7 7. Open Table
Agenda
1. Administrative update (Todd; 10 minutes)
- WS239 in prebake
- App updates still okay
- WS240 dates
- upload deadline
- build starts next week
- released by Hinxton Oct 25
- Jenkins instance issues
2. WS239 development status (all; 10 minutes)
- briggsae db bioproject id fix
- hold off on GFF3
3. Intermine development update (JD; 10 minutes)
- added rnai
- expanded classes
- gff3 loaded
- fasta loaded
- finished 3/4 orthologies - not in this build
- will be able to load orthologies on top of everything
- build currently running
- ETA: at least 1.5 days
- mappings are expanded, will be longer (significantly)
4. Intermine development restructuring (all; 10 minutes)
- granted leave of absence
- pursue US citizenship
- will return after 6 months
- planning on remaining on wormbase as volunteer and handling intermine issues
- bring joachim on to intermine development
- need distributed experience
- need experience in-house
- plan: Have Joachim work through build process with 239
- 1) Joachim can work through process - see how difficult it is to pick up
- 2) Refine process
- 1 month to get accustomed - JB
- JD will help Joachim along.
- doing the build - JD not sure if Hinxton is in a position to handle the build
- doesn't think it's in a position to transfer to them
5. GFF3 development status (10 minutes)
- wait till new GFF3 from Kevin
- JB - stopped looking at GFF3 for now
- visualizations
- Documentation - spreadsheet
- take all source/type - populate spreadsheet
6. Mobile app update (Abby; 5 minutes)
http://wiki.wormbase.org/index.php/Developer_documentation#The_Mobile_Website Goal: Get mobile website up for WS240