Difference between revisions of "WebDev 2010.02.10-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchLine 25: | Line 25: | ||
-- XS area... | -- XS area... | ||
+ | |||
-- Moose | -- Moose | ||
+ | |||
-- Reorganize the code a little bit | -- Reorganize the code a little bit | ||
+ | |||
-- Every DB is considered a service; all of which implements a "connect" method | -- Every DB is considered a service; all of which implements a "connect" method | ||
Revision as of 17:19, 10 February 2010
Contents
Agenda
1. Administrative Update (Todd; 5 minutes)
- WS210 polish up work
- GBrowse 2
- Frozen release WS210
2. Design Specifications Review (All; 25 minutes)
Reference Materials
- Work/expertise divided up for various facets of the effort
- Educate and train everyone else
- Links provided below:
- Currently 11 areas
For today's review:
-- XS area...
-- Moose
-- Reorganize the code a little bit
-- Every DB is considered a service; all of which implements a "connect" method
--
--
--