Difference between revisions of "WebDev 2016.04.12-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 8: Line 8:
  
 
==Website==
 
==Website==
 +
*LEGO
 +
** temporarily deployed at http://dev.wormbase.org:9004/, Kimberly shared with GO group for feedback
 +
** Last week: done fetching and render entity (node) information from WB REST API, resolved browser compatibility issue with Polyfill, color palette for drawing, tune animation..
 +
** TODO this week: email GO group about whether their API could support some extra feature.
 +
*Variation Vis
 +
** have been fixing things to get the correct CDS model showing.
 +
** TODO this week: get it working first, before tackle performence isssue
  
 
==Intermine==
 
==Intermine==

Revision as of 14:01, 12 April 2016

Minutes for Web Dev Weekly Call (Apr 12, 2016)

JBrowse

  • Finished work to change categories of several tracks in GBrowse; awaiting feedback and then will implement in JBrowse.
  • Improve jbrowse track selection with a plugin, between a simple vs detailed/full view--needs a proxy update to work fully.

ToDo: - look into options to draw users attention to the new feature; perhaps a css addition that highlights "New!"

Website

  • LEGO
    • temporarily deployed at http://dev.wormbase.org:9004/, Kimberly shared with GO group for feedback
    • Last week: done fetching and render entity (node) information from WB REST API, resolved browser compatibility issue with Polyfill, color palette for drawing, tune animation..
    • TODO this week: email GO group about whether their API could support some extra feature.
  • Variation Vis
    • have been fixing things to get the correct CDS model showing.
    • TODO this week: get it working first, before tackle performence isssue

Intermine

Datomic & website migration

  • took the minimal necessary changes for website - Clojure API integration.
    • so further Clojure API generally doesn't require code changes in website repo
  • Still waiting for Data for WS252 to be correct

Docker

  • we moved docker image storage to the mounted drive, so it won't use up root directory space
  • building the image for WormBase/website has been built
  • TODO this week:
    • testing running container from the image
    • creating documentation and a small get started tutorial for team