Difference between revisions of "WebDev 2013.11.01-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
 
Line 9: Line 9:
 
==== Deadlines ====
 
==== Deadlines ====
 
'''development : 13 Dec 2013'''
 
'''development : 13 Dec 2013'''
** mobile site launch?
+
* mobile site launch? (Abby)
** expression visualization
+
* expression visualization (Joachim)
  
 
'''production : 27 Dec 2013'''
 
'''production : 27 Dec 2013'''
* requirements doc for new backend
+
* requirements doc for new backend (Abby and Todd)
* OpsWorks pipeline for production
+
* OpsWorks pipeline for production (Todd)
 +
* WS240 intermine build (Joachim)
  
 
== 4. Open Table ==
 
== 4. Open Table ==

Latest revision as of 14:23, 1 November 2013

Agenda

1. Administrative update (Todd; 5 minutes)

2. Intermine build progress (Joachim; 10 minutes)

3. WS240 dev objectives (all; 20 minutes)

Deadlines

development : 13 Dec 2013

  • mobile site launch? (Abby)
  • expression visualization (Joachim)

production : 27 Dec 2013

  • requirements doc for new backend (Abby and Todd)
  • OpsWorks pipeline for production (Todd)
  • WS240 intermine build (Joachim)

4. Open Table