Difference between revisions of "WebDev 2013.10.25-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 17: Line 17:
  
 
= Minutes =
 
= Minutes =
 +
== 1. Admin ==
 +
* 240 build underway
 +
 +
== 2. Intermine Handover

Revision as of 15:07, 25 October 2013

Agenda

1. Administrative Update (Todd; 5 minutes)

2. InterMine handover status (JD, Joachim;15 minutes)

3. InterMine status (JD; 10 minutes)

  • WS239 mine has been released, but I have discovered duplicate records caused by the addition of new species. The configuration has been updated, but a new build must be compiled. Until then, the mine will be rolled back to WS238.
  • The process of automating second-degree ( record -> middleman record -> annotation ) is 50-75% done. Branch "upgrade-loader" contains work and can be found on git.

4. Discuss WS239 issues (all; 10 minutes)

  • location hotfix ready

5. Define WS240 plans (all; 15 minutes)

6. Open Table (all; 5 minutes)

Minutes

1. Admin

  • 240 build underway

== 2. Intermine Handover