Difference between revisions of "WebDev 2013.10.25-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchLine 17: | Line 17: | ||
= Minutes = | = Minutes = | ||
+ | == 1. Admin == | ||
+ | * 240 build underway | ||
+ | |||
+ | == 2. Intermine Handover |
Revision as of 15:07, 25 October 2013
Agenda
1. Administrative Update (Todd; 5 minutes)
2. InterMine handover status (JD, Joachim;15 minutes)
3. InterMine status (JD; 10 minutes)
- WS239 mine has been released, but I have discovered duplicate records caused by the addition of new species. The configuration has been updated, but a new build must be compiled. Until then, the mine will be rolled back to WS238.
- The process of automating second-degree ( record -> middleman record -> annotation ) is 50-75% done. Branch "upgrade-loader" contains work and can be found on git.
4. Discuss WS239 issues (all; 10 minutes)
- location hotfix ready
5. Define WS240 plans (all; 15 minutes)
6. Open Table (all; 5 minutes)
Minutes
1. Admin
- 240 build underway
== 2. Intermine Handover