Difference between revisions of "WebDev 2013.08.09-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
(Created page with '= Agenda = == 1. Administrative update (Todd; 5 minutes) == == 2. Mobile app development (Antonio; 10 minutes) == == 3. General development update (JD, Joachim) == ''GBrowse …')
 
Line 10: Line 10:
  
 
''Process pages''
 
''Process pages''
 +
 +
== 4. Intermine development update (JD; 10 minutes) ==
  
  
 
== WS239 development priorities ==
 
== WS239 development priorities ==
  
''GFF3!''
+
'''GFF3!'''
 
* Native GFF3 arrives with WS239
 
* Native GFF3 arrives with WS239
  
''Genome Browsers''
+
'''Genome Browsers'''
 
* Finalize and launch survey, mid September
 
* Finalize and launch survey, mid September
 
* Draw up requirements document
 
* Draw up requirements document
 
* Short list of candidates
 
* Short list of candidates
  
''Administration''
+
'''Administration'''
 
* prepare NAR manuscript
 
* prepare NAR manuscript
 
* Cloud: consolidate expiring reserved instances
 
* Cloud: consolidate expiring reserved instances
 
* Begin next migration steps
 
* Begin next migration steps
  
''Intermine''
+
'''Intermine'''
 
* expand coverage of existing classes, particularly:
 
* expand coverage of existing classes, particularly:
 
** variation: distinguish polymorphisms from alleles; add meaningful content on nature of molecular change
 
** variation: distinguish polymorphisms from alleles; add meaningful content on nature of molecular change
 
** gene: add orthologs
 
** gene: add orthologs
 
** rnai/phenotype: time permitting
 
** rnai/phenotype: time permitting

Revision as of 14:27, 9 August 2013

Agenda

1. Administrative update (Todd; 5 minutes)

2. Mobile app development (Antonio; 10 minutes)

3. General development update (JD, Joachim)

GBrowse issues

Process pages

4. Intermine development update (JD; 10 minutes)

WS239 development priorities

GFF3!

  • Native GFF3 arrives with WS239

Genome Browsers

  • Finalize and launch survey, mid September
  • Draw up requirements document
  • Short list of candidates

Administration

  • prepare NAR manuscript
  • Cloud: consolidate expiring reserved instances
  • Begin next migration steps

Intermine

  • expand coverage of existing classes, particularly:
    • variation: distinguish polymorphisms from alleles; add meaningful content on nature of molecular change
    • gene: add orthologs
    • rnai/phenotype: time permitting