Difference between revisions of "WebDev 2011.07.13-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchLine 40: | Line 40: | ||
'''* Deployment strategy (Todd)''' | '''* Deployment strategy (Todd)''' | ||
− | + | :'''Complete: 2011.0.13''' | |
:[[Developer_documentation#Software_Life_Cycle|Formal software life cycle]] | :[[Developer_documentation#Software_Life_Cycle|Formal software life cycle]] | ||
− | :[[Software_Life_Cycle:_4._Updating_The_Production_Servers|Production | + | :[[Software_Life_Cycle:_4._Updating_The_Production_Servers|Production deployment]] |
* Tested and documented production architecture (Todd) | * Tested and documented production architecture (Todd) |
Revision as of 19:04, 13 July 2011
Contents
Agenda
Administrative Update (Todd; 5 minutes)
Steps for hiring out graphic design assistance
Usability testing scheduling update (Todd; 5 minutes)
Review public beta milestones (All; 10 minutes)
Copied and pasted here from the original July 6th conference call notes
Release target: on or before 9/1/2011
- Six (group or individual) focus group tests
- Benchmarking and profiling (Todd)
- Model development support for flat file queries (Norie)
- View development in support of model changes: ontology, orthology, disease (Norie)
- Error trapping and logging (Todd; Abby)
- Central Dogma navigation element (Abby)
- POC Summary page searches, eg Expr Pattern (Todd)
- Omnipresent sequence download options (Abby)
- Support for wiki integration and/or in-app content management (Abby)
- Automation (Todd) of Xapian db
- Documentation and boilerplate in place (all)
- Issue / commenting system tested; reporting in place (all)
* Deployment strategy (Todd)
- Complete: 2011.0.13
- Formal software life cycle
- Production deployment
- Tested and documented production architecture (Todd)
- User survey and link in place
- Heterogeneous caching (Todd)
- 2011.07.13: in testing
- Portals? (Abby)
- Auth/Auth, Facebook login (Todd: SSL; Abby: Facebook not required for beta launch)