Difference between revisions of "WebDev 2011.07.13-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 37: Line 37:
 
* Issue / commenting system tested; reporting in place (all)
 
* Issue / commenting system tested; reporting in place (all)
  
* '''Deployment strategy (Todd)'''
+
'''* Deployment strategy (Todd)'''
  
 
:[[Developer_documentation#Software_Life_Cycle|Formal software life cycle]]
 
:[[Developer_documentation#Software_Life_Cycle|Formal software life cycle]]

Revision as of 18:29, 13 July 2011

Agenda

Administrative Update (Todd; 5 minutes)

Steps for hiring out graphic design assistance

Usability Testing Update (Todd; 5 minutes)

Review public beta milestones (All; 10 minutes)

Copied and pasted here from the original July 6th conference call notes

Release target: on or before 9/1/2011

  • Six (group or individual) focus group tests
  • Benchmarking and profiling (Todd)
  • Model development support for flat file queries (Norie)
  • View development in support of model changes: ontology, orthology, disease (Norie)
  • Error trapping and logging (Todd; Abby)
  • Central Dogma navigation element (Abby)
  • POC Summary page searches, eg Expr Pattern (Todd)
  • Omnipresent sequence download options (Abby)
  • Support for wiki integration and/or in-app content management (Abby)
  • Automation (Todd) of Xapian db
  • Documentation and boilerplate in place (all)
  • Issue / commenting system tested; reporting in place (all)

* Deployment strategy (Todd)

Formal software life cycle
Production Deployment
  • Heterogeneous caching (Todd)
  • Portals? (Abby)
  • Add proof of concept searches -- summary page searches
  • Links to download sequences
  • Auth/Auth, Facebook login (Todd: SSL; Abby: Facebook not required for beta launch)