Difference between revisions of "WebDev 2011.07.06-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
 
(7 intermediate revisions by 2 users not shown)
Line 15: Line 15:
  
 
== 3. General updates (all; 10 minutes) ==
 
== 3. General updates (all; 10 minutes) ==
 +
 +
* Norie: Disease data work -- Diseaese.ace file generation, disease model; work with Michael Paulini/Han
 +
* Abby: Debugging alot of items
 +
* TH:
  
 
== 4. 'Mart maintenance (all; 5 minutes) ==
 
== 4. 'Mart maintenance (all; 5 minutes) ==
 +
 +
* We want to update with each build
 +
* Abby has some discussions with Mart developers
  
 
== 5. Milestones prior to public release of beta (All; 15 minutes) ==
 
== 5. Milestones prior to public release of beta (All; 15 minutes) ==
Line 31: Line 38:
  
 
* Error trapping and logging (Todd; Abby)
 
* Error trapping and logging (Todd; Abby)
 
* Auth/Auth, Facebook login (Abby)
 
  
 
* Central Dogma navigation element (Abby)
 
* Central Dogma navigation element (Abby)
Line 40: Line 45:
 
* Omnipresent sequence download options (Abby)
 
* Omnipresent sequence download options (Abby)
  
* Support for wiki integration and/or in-app content management (Abby, Todd)
+
* Support for wiki integration and/or in-app content management (Abby)
  
* Expansion (Abby) and automation (Todd) of Xapian db
+
* Automation (Todd) of Xapian db
  
 
* Documentation and boilerplate in place (all)
 
* Documentation and boilerplate in place (all)
Line 49: Line 54:
  
 
* Deployment strategy (Todd)
 
* Deployment strategy (Todd)
 +
 +
* Heterogeneous caching (Todd)
 +
 +
* Portals? (Abby)
 +
 +
* Add proof of concept searches -- summary page searches
 +
 +
* Links to download sequences
 +
 +
* Auth/Auth, Facebook login (Todd: SSL; Abby: Facebook not required for beta launch)

Latest revision as of 19:35, 11 July 2011

Agenda

1. Administrative Update

  • completed move of hg repository to git
  • caltech given run-through @ IWM

2. Focus Group testing plans (all; 10 minutes)

  • original plan for beta testing pushed back
  • move to focus group testing -- few individual signers @ IWM
  • will pick individual labs in TO and some other places, inc SAB folks
  • give demo and address comments for a week
  • specific tasks? or scenarios

3. General updates (all; 10 minutes)

  • Norie: Disease data work -- Diseaese.ace file generation, disease model; work with Michael Paulini/Han
  • Abby: Debugging alot of items
  • TH:

4. 'Mart maintenance (all; 5 minutes)

  • We want to update with each build
  • Abby has some discussions with Mart developers

5. Milestones prior to public release of beta (All; 15 minutes)

Release target: on or before 9/1/2011

  • Six (group or individual) focus group tests
  • Benchmarking and profiling (Todd)
  • Model development support for flat file queries (Norie)
  • View development in support of model changes: ontology, orthology, disease (Norie)
  • Error trapping and logging (Todd; Abby)
  • Central Dogma navigation element (Abby)
  • POC Summary page searches, eg Expr Pattern (Todd)
  • Omnipresent sequence download options (Abby)
  • Support for wiki integration and/or in-app content management (Abby)
  • Automation (Todd) of Xapian db
  • Documentation and boilerplate in place (all)
  • Issue / commenting system tested; reporting in place (all)
  • Deployment strategy (Todd)
  • Heterogeneous caching (Todd)
  • Portals? (Abby)
  • Add proof of concept searches -- summary page searches
  • Links to download sequences
  • Auth/Auth, Facebook login (Todd: SSL; Abby: Facebook not required for beta launch)