Difference between revisions of "WebDev 2011.04.20-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
== 1. WS225 (Norie; 5 minutes) ==
 
== 1. WS225 (Norie; 5 minutes) ==
  
Staging on going.  Should be completed by the weekend.  Testing and documentation the rest of the week.
+
* Staging on going.  Should be completed by the weekend.  Testing and documentation the rest of the week.
Extended data staging period is great.  Sanger has been able to QC data as patches keep coming in.
+
* Extended data staging period is great.  Sanger has been able to QC data as patches keep coming in.
  
 
== 2. Testing and External model development progress (Norie; 10 minutes) ==
 
== 2. Testing and External model development progress (Norie; 10 minutes) ==
 +
* Incorporated method output inspection capabilities to testing suite.  Created tests for models in my charge. 
 +
* UI development really helped by Adrians tests.  Fleshing out UI for Models under my name.
 +
 
== 3. Testing Progress (Adrian; 10 minutes) ==
 
== 3. Testing Progress (Adrian; 10 minutes) ==
 +
 +
* set up a testing db
 +
* used tace to set-up
 +
* finished test to check static pages -- WWW::View::Robot, Test::WWW::Mechanized::Catalyst
 +
* next -- test REST interface; then individual tests for specifics
 +
 
== 4. UI and Search Progress (Abby; 10 minutes) ==
 
== 4. UI and Search Progress (Abby; 10 minutes) ==
 +
 +
* automating search building items
 +
* bringing in newer classes
  
 
== 5. Open Table ==
 
== 5. Open Table ==

Latest revision as of 21:03, 20 April 2011

Agendas

1. WS225 (Norie; 5 minutes)

  • Staging on going. Should be completed by the weekend. Testing and documentation the rest of the week.
  • Extended data staging period is great. Sanger has been able to QC data as patches keep coming in.

2. Testing and External model development progress (Norie; 10 minutes)

  • Incorporated method output inspection capabilities to testing suite. Created tests for models in my charge.
  • UI development really helped by Adrians tests. Fleshing out UI for Models under my name.

3. Testing Progress (Adrian; 10 minutes)

  • set up a testing db
  • used tace to set-up
  • finished test to check static pages -- WWW::View::Robot, Test::WWW::Mechanized::Catalyst
  • next -- test REST interface; then individual tests for specifics

4. UI and Search Progress (Abby; 10 minutes)

  • automating search building items
  • bringing in newer classes

5. Open Table