Difference between revisions of "WebDev 2010.11.03-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to search(2 intermediate revisions by the same user not shown) | |||
Line 38: | Line 38: | ||
* Continuing analysis of code and system | * Continuing analysis of code and system | ||
* TH has set up account on production machine | * TH has set up account on production machine | ||
− | * Remove BioMart from menu if redirect loop issues cannot easily resolved -- LS | + | * Remove BioMart from menu if redirect loop issues cannot easily be resolved -- LS |
== 7. Review December 1st Milestone tickets == | == 7. Review December 1st Milestone tickets == | ||
[http://bitbucket.org/tharris/wormbase/issues?milestone=December%201st%20Rollout Outstanding Tickets] | [http://bitbucket.org/tharris/wormbase/issues?milestone=December%201st%20Rollout Outstanding Tickets] | ||
+ | |||
+ | * TH -- Good progress; On target for 12/01 milestone | ||
+ | * OPEN table -- Adrian Duong new person hired for U Waterloo to assist while XS is on maternity leave. Very enthusiastic re: Catalyst. |
Latest revision as of 20:57, 3 November 2010
Contents
- 1 Agenda
- 1.1 1. Administrative Update (Todd; 5 minutes)
- 1.2 2. Discuss WS220 staging status (Norie; 10 minutes)
- 1.3 3. Browser support matrix (Todd; 5 minutes)
- 1.4 4. New site: layout progress (Abby; 10 minutes)
- 1.5 5. New site: login improvements; protein motifs (Xiaoqi; 10 minutes)
- 1.6 6. Discuss WormMart progress (Ruihua; 10 minutes)
- 1.7 7. Review December 1st Milestone tickets
Agenda
1. Administrative Update (Todd; 5 minutes)
- Between builds, not alot of movement
2. Discuss WS220 staging status (Norie; 10 minutes)
Phenotype NOT
Model in place, but data not yet migrated, but will be in place with WS221.
New Species
3. Browser support matrix (Todd; 5 minutes)
WormBase Browser Support statement
- matrix identifies priorities for testing
- Currently Mac OS is most popular given our audience, XP is next
- TH to do further analyses
4. New site: layout progress (Abby; 10 minutes)
layout: http://dev.wormbase.org:9010/reports/gene/WBGene00015146
global nav: https://docs.google.com/present/view?id=dfpxfth7_53gstxsxds
5. New site: login improvements; protein motifs (Xiaoqi; 10 minutes)
- Added Twitter account login
- Provide access given different roles -- TH
6. Discuss WormMart progress (Ruihua; 10 minutes)
- Set up example mart
- Continuing analysis of code and system
- TH has set up account on production machine
- Remove BioMart from menu if redirect loop issues cannot easily be resolved -- LS
7. Review December 1st Milestone tickets
- TH -- Good progress; On target for 12/01 milestone
- OPEN table -- Adrian Duong new person hired for U Waterloo to assist while XS is on maternity leave. Very enthusiastic re: Catalyst.