Difference between revisions of "WebDev 2010.11.03-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
 
(6 intermediate revisions by the same user not shown)
Line 29: Line 29:
  
 
== 5. New site: login improvements; protein motifs (Xiaoqi; 10 minutes) ==
 
== 5. New site: login improvements; protein motifs (Xiaoqi; 10 minutes) ==
 +
 +
* Added Twitter account login
 +
* Provide access given different roles -- TH
  
 
== 6. Discuss WormMart progress (Ruihua; 10 minutes) ==
 
== 6. Discuss WormMart progress (Ruihua; 10 minutes) ==
 +
 +
* Set up example mart
 +
* Continuing analysis of code and system
 +
* TH has set up account on production machine
 +
* Remove BioMart from menu if redirect loop issues cannot easily be resolved -- LS
  
 
== 7. Review December 1st Milestone tickets ==
 
== 7. Review December 1st Milestone tickets ==
  
 
[http://bitbucket.org/tharris/wormbase/issues?milestone=December%201st%20Rollout Outstanding Tickets]
 
[http://bitbucket.org/tharris/wormbase/issues?milestone=December%201st%20Rollout Outstanding Tickets]
 +
 +
* TH -- Good progress; On target for 12/01 milestone
 +
* OPEN table -- Adrian Duong new person hired for U Waterloo to assist while XS is on maternity leave. Very enthusiastic re: Catalyst.

Latest revision as of 20:57, 3 November 2010

Agenda

1. Administrative Update (Todd; 5 minutes)

  • Between builds, not alot of movement

2. Discuss WS220 staging status (Norie; 10 minutes)

Phenotype NOT

Model in place, but data not yet migrated, but will be in place with WS221.

New Species

3. Browser support matrix (Todd; 5 minutes)

WormBase Browser Support statement

  • matrix identifies priorities for testing
  • Currently Mac OS is most popular given our audience, XP is next
  • TH to do further analyses

4. New site: layout progress (Abby; 10 minutes)

layout: http://dev.wormbase.org:9010/reports/gene/WBGene00015146

global nav: https://docs.google.com/present/view?id=dfpxfth7_53gstxsxds

5. New site: login improvements; protein motifs (Xiaoqi; 10 minutes)

  • Added Twitter account login
  • Provide access given different roles -- TH

6. Discuss WormMart progress (Ruihua; 10 minutes)

  • Set up example mart
  • Continuing analysis of code and system
  • TH has set up account on production machine
  • Remove BioMart from menu if redirect loop issues cannot easily be resolved -- LS

7. Review December 1st Milestone tickets

Outstanding Tickets

  • TH -- Good progress; On target for 12/01 milestone
  • OPEN table -- Adrian Duong new person hired for U Waterloo to assist while XS is on maternity leave. Very enthusiastic re: Catalyst.