WebDev 2010.10.20-Agenda and Minutes

From WormBaseWiki
Jump to navigationJump to search

Agenda

Administrative Update

Discuss WS219 snags and status (Norie, 10 minutes)

BioMart development update (Ruihua, 10 minutes)

Interface development update (Abby; 10 minutes)

Development update (Xiaoqi; 10 minutes)

December 1st Milestone prioritization (all; 15 minutes)

Objective: Release the site for an invited public testing period to include the following features:

  • Rich support for five classes (Gene, Variation, Sequence, Protein, Clone)
  • Basic object searching
  • Login features, and maintenance of state in load-balanced environment
  • Look-and-feel refined to public prototype
  • Global navigation elements
  • Example of a Tool section page (Blast)
  • Example of a Meta section page (Ontology? Laboratory?)
  • A user survey for those testing the site

See milestone tickets at:

http://bitbucket.org/tharris/wormbase/issues?milestone=December%201st%20Rollout&sort=id