Difference between revisions of "WebDev 2010.10.20-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 12: Line 12:
  
 
== BioMart development update (Ruihua, 10 minutes) ==
 
== BioMart development update (Ruihua, 10 minutes) ==
 +
 +
* Documentation received from AC, assistance from TH
 +
* AceDB version issue -- need 4.9.39, monthly release; AC uses external server; TH to help with trouble shoot
  
 
== Interface development update (Abby; 10 minutes) ==
 
== Interface development update (Abby; 10 minutes) ==

Revision as of 20:20, 20 October 2010

Agenda

Administrative Update

  • rolling out WS219

Discuss WS219 snags and status (Norie, 10 minutes)

  • WS219 all set
  • Came out late
  • Phenotype_not_observed tag model change, effective for RNAi

BioMart development update (Ruihua, 10 minutes)

  • Documentation received from AC, assistance from TH
  • AceDB version issue -- need 4.9.39, monthly release; AC uses external server; TH to help with trouble shoot

Interface development update (Abby; 10 minutes)

Development update (Xiaoqi; 10 minutes)

http://beta.wormbase.org/to
http://beta.wormbase.org/reports/gene/unc-26 
http://beta.wormbase.org/reports/gene/WBGene0000676
  • protein motif image
gary.png
http://pfam.sanger.ac.uk/protein/PFTK2_HUMAN

December 1st Milestone prioritization (all; 15 minutes)

Objective: Release the site for an invited public testing period to include the following features:

  • Rich support for five classes (Gene, Variation, Sequence, Protein, Clone)
  • Basic object searching
  • Login features, and maintenance of state in load-balanced environment
  • Look-and-feel refined to public prototype
  • Global navigation elements
  • Example of a Tool section page (Blast)
  • Example of a Meta section page (Ontology? Laboratory?)
  • A user survey for those testing the site

See milestone tickets at:

http://bitbucket.org/tharris/wormbase/issues?milestone=December%201st%20Rollout&sort=id