WebDev 2010.03.31-Agenda and Minutes

From WormBaseWiki
Jump to navigationJump to search

Agenda

1. Administration Update (Todd; 5 minutes)

  • WS212

- Rolling out -- should be done later today.

  • WormMart / data mining server

- Setting up to do double duty as datamining server. - Will be up with WS213

2. GB2 production status (Todd; 10 minutes)

http://www.wormbase.org/db/gb2/gbrowse/c_elegans/


What's done:

  • Reverse proxy
  • Updated configuration files
  • Reports & Analysis debugging
  • Maintenance crons
  • New update scripts
  • Modified configuration files
  • modENCODE tracks

Remaining:

  • render slaves on master and slave servers
  • backups

3. Gene Page prototype progress (Abby, Xq, Norie; 15 minutes)

http://dev.wormbase.org:8080/reports/gene/WBGene00004921

4. Define April Milestones (all; 10 minutes)

Proposed Milestones

Expand database connectivity and make it more robust (Xq)

  • Failover
  • Additional GFF DB support

Finish and polish the prototype page report (all)

  • basic/advanced search interface
  • multiple hits display
  • no hits display
  • asynchronous interface prototype. Tabs? Accordion? Selectable?

API for Sequence, Protein, Clone, Variation, Strain (overseen by Norie with help from all)

Public demo site (Todd)

  • Backups
  • Nightly builds

Widget/Page level caching (Todd

To consider:

  • maintenance interface
  • debugging / logging
  • performance metrics
  • caching / cloud layer