WebDev 2010.02.10-Agenda and Minutes

From WormBaseWiki
Jump to navigationJump to search

Agenda

1. Administrative Update (Todd; 5 minutes)

  • WS210 polish up work
  • GBrowse 2
  • Frozen release WS210

2. Design Specifications Review (All; 25 minutes)

Reference Materials

  • Work/expertise divided up for various facets of the effort
  • Educate and train everyone else
  • Links provided below:

Rearchitecture design stages

Design Specifications

  • Currently 11 areas

For today's review:

-- XS area...

-- Moose

-- Reorganize the code a little bit

-- Every DB is considered a service; all of which implements a "connect" method

--

--

--

3. WS211 Update status (Norie, 10 minutes)

4. Open Table