Difference between revisions of "WebDev 2010.02.10-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 25: Line 25:
  
 
  - XS area...
 
  - XS area...
  - Moose
+
  - Use Moose
 
  - Reorganize the code a little bit
 
  - Reorganize the code a little bit
 
  - Every DB is considered a service; all of which implements a "connect" method
 
  - Every DB is considered a service; all of which implements a "connect" method
 +
- Address configuration issues for DBs and servers
  
 
* [[Design_Specs:_API|API]]
 
* [[Design_Specs:_API|API]]
  
--
+
 +
 
 
* [[Design_Specs:_Application_Configuration|Application Configuration]]
 
* [[Design_Specs:_Application_Configuration|Application Configuration]]
  

Revision as of 17:23, 10 February 2010

Agenda

1. Administrative Update (Todd; 5 minutes)

  • WS210 polish up work
  • GBrowse 2
  • Frozen release WS210

2. Design Specifications Review (All; 25 minutes)

Reference Materials

  • Work/expertise divided up for various facets of the effort
  • Educate and train everyone else
  • Links provided below:

Rearchitecture design stages

Design Specifications

  • Currently 11 areas

For today's review:

- XS area...
- Use Moose
- Reorganize the code a little bit
- Every DB is considered a service; all of which implements a "connect" method
- Address configuration issues for DBs and servers


--

--

3. WS211 Update status (Norie, 10 minutes)

4. Open Table