Difference between revisions of "WebDev 2010.02.10-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 24: Line 24:
 
* [[Design_Specs:_Database_Connectivity|Database Connectivity]]
 
* [[Design_Specs:_Database_Connectivity|Database Connectivity]]
  
-- XS area...
+
- XS area...
 
+
- Moose
-- Moose
+
- Reorganize the code a little bit
 
+
- Every DB is considered a service; all of which implements a "connect" method
-- Reorganize the code a little bit
 
 
 
-- Every DB is considered a service; all of which implements a "connect" method
 
  
 
* [[Design_Specs:_API|API]]
 
* [[Design_Specs:_API|API]]

Revision as of 17:20, 10 February 2010

Agenda

1. Administrative Update (Todd; 5 minutes)

  • WS210 polish up work
  • GBrowse 2
  • Frozen release WS210

2. Design Specifications Review (All; 25 minutes)

Reference Materials

  • Work/expertise divided up for various facets of the effort
  • Educate and train everyone else
  • Links provided below:

Rearchitecture design stages

Design Specifications

  • Currently 11 areas

For today's review:

- XS area...
- Moose
- Reorganize the code a little bit
- Every DB is considered a service; all of which implements a "connect" method

--

--

--

3. WS211 Update status (Norie, 10 minutes)

4. Open Table