Difference between revisions of "WebDev 2010.02.10-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 22: Line 22:
 
* [[Design_Specs:_Database_Connectivity|Database Connectivity]]
 
* [[Design_Specs:_Database_Connectivity|Database Connectivity]]
  
** test
+
* test
  
 
* [[Design_Specs:_API|API]]
 
* [[Design_Specs:_API|API]]

Revision as of 17:11, 10 February 2010

Agenda

1. Administrative Update (Todd; 5 minutes)

  • WS210 polish up work
  • GBrowse 2
  • Frozen release WS210

2. Design Specifications Review (All; 25 minutes)

Reference Materials

  • Work/expertise divided up for various facets of the effort
  • Educate and train everyone else
  • Links provided below:

Rearchitecture design stages

Design Specifications

For today's review:

* test

3. WS211 Update status (Norie, 10 minutes)

4. Open Table