Difference between revisions of "WebDev 2010.02.10-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 2: Line 2:
  
 
== 1. Administrative Update (Todd; 5 minutes) ==
 
== 1. Administrative Update (Todd; 5 minutes) ==
 +
 +
* WS210 polish up work
 +
* GBrowse 2
 +
* Frozen release WS210
  
 
== 2. Design Specifications Review (All; 25 minutes) ==
 
== 2. Design Specifications Review (All; 25 minutes) ==

Revision as of 17:06, 10 February 2010

Agenda

1. Administrative Update (Todd; 5 minutes)

  • WS210 polish up work
  • GBrowse 2
  • Frozen release WS210

2. Design Specifications Review (All; 25 minutes)

Reference Materials

Rearchitecture design stages

Design Specifications

For today's review:

3. WS211 Update status (Norie, 10 minutes)

4. Open Table