Difference between revisions of "WebDev 2010.01.03-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchLine 5: | Line 5: | ||
* WS210 is up and in production | * WS210 is up and in production | ||
* frozen release in the works | * frozen release in the works | ||
+ | * CVS repository restored | ||
== Discuss depth/format of site specifications; define timeline (all; 15 minutes) == | == Discuss depth/format of site specifications; define timeline (all; 15 minutes) == |
Revision as of 17:10, 3 February 2010
Contents
- 1 Agenda & Minutes
- 1.1 Administration Update (Todd; 5 minutes)
- 1.2 Discuss depth/format of site specifications; define timeline (all; 15 minutes)
- 1.3 GBrowse 2.0 status (Abby and Xq; 10 minutes)
- 1.4 3rd party tools: Cytoscape, nBrowse, cis-ortho (Xq; 10 minutes)
- 1.5 Describe WS211 build status (Norie; 10 minutes)
- 1.6 Open table
Agenda & Minutes
Administration Update (Todd; 5 minutes)
- WS210 is up and in production
- frozen release in the works
- CVS repository restored
Discuss depth/format of site specifications; define timeline (all; 15 minutes)
GBrowse 2.0 status (Abby and Xq; 10 minutes)
- inline image stable on dev
- issue on the sequence page for live site
3rd party tools: Cytoscape, nBrowse, cis-ortho (Xq; 10 minutes)
- Cytoscape: network data to an XML format (either XGMML or GraphML)
- nBrowse: nothing new
- cis-ortho: hunt down author
Describe WS211 build status (Norie; 10 minutes)
Open table
- update ontology/anatom script on live -- Raymond's request for database_url