Difference between revisions of "WebDev 2010.01.03-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 5: Line 5:
 
* WS210 is up and in production
 
* WS210 is up and in production
 
* frozen release in the works
 
* frozen release in the works
 +
* CVS repository restored
  
 
== Discuss depth/format of site specifications; define timeline (all; 15 minutes) ==
 
== Discuss depth/format of site specifications; define timeline (all; 15 minutes) ==

Revision as of 17:10, 3 February 2010

Agenda & Minutes

Administration Update (Todd; 5 minutes)

  • WS210 is up and in production
  • frozen release in the works
  • CVS repository restored

Discuss depth/format of site specifications; define timeline (all; 15 minutes)

GBrowse 2.0 status (Abby and Xq; 10 minutes)

  • inline image stable on dev
  • issue on the sequence page for live site

3rd party tools: Cytoscape, nBrowse, cis-ortho (Xq; 10 minutes)

  • Cytoscape: network data to an XML format (either XGMML or GraphML)
  • nBrowse: nothing new
  • cis-ortho: hunt down author

Describe WS211 build status (Norie; 10 minutes)

Open table

  • update ontology/anatom script on live -- Raymond's request for database_url