WebDev 2009.12.23-Agenda and Minutes
From WormBaseWiki
Revision as of 17:20, 23 December 2009 by Tharris (talk | contribs) (→3. WS210 scheduling (Norie; 10 minutes))
Contents
Agenda
1. Administration (Todd; 10 minutes)
- Rolling out WS209 into production
2. GBrowse 2.x status (Abby; 10 minutes)
- AC installed GBrowse 1.9984
- Currently ironing out inline image issues, will need another version from CPAN
- LS: committing new fixes
- Track sharing: AC looking into 1.998 issues
3. WS210 scheduling (Norie; 10 minutes)
Scheduling with Abby and Xiaoqi
Data is already available, start build process