Difference between revisions of "WebDev 2009.12.23-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 13: Line 13:
  
 
== 3. WS210 scheduling (Norie; 10 minutes) ==
 
== 3. WS210 scheduling (Norie; 10 minutes) ==
 +
 +
Scheduling with Abby and Xiaoqi
 +
 +
Data is already available, start build process
  
 
==4. SAB planning ==
 
==4. SAB planning ==

Revision as of 17:20, 23 December 2009

Agenda

1. Administration (Todd; 10 minutes)

  • Rolling out WS209 into production

2. GBrowse 2.x status (Abby; 10 minutes)

  • AC installed GBrowse 1.9984
  • Currently ironing out inline image issues, will need another version from CPAN
  • LS: committing new fixes
  • Track sharing: AC looking into 1.998 issues

3. WS210 scheduling (Norie; 10 minutes)

Scheduling with Abby and Xiaoqi

Data is already available, start build process

4. SAB planning

5. 2010 schedule

6. Open Table