Difference between revisions of "WBConfCall 2018.03.01-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 1: Line 1:
 
= Agenda =
 
= Agenda =
 
== AGR SAB ==
 
 
* Anything we need to know?
 
  
 
== WormBase SAB  ==
 
== WormBase SAB  ==
Line 10: Line 6:
  
 
https://doodle.com/poll/vf9zb2ntvxdb7s7k
 
https://doodle.com/poll/vf9zb2ntvxdb7s7k
 +
 +
== AGR SAB ==
 +
 +
* Anything we need to know?
  
 
== Open Tickets ==
 
== Open Tickets ==
Line 17: Line 17:
 
= Minutes =
 
= Minutes =
 
== SAB Meeting Date  ==
 
== SAB Meeting Date  ==
 +
 +
Best dates for the meeting are July 12th-13th 2018 in Toronto.
 +
(there is a Caenorhabditis evolution meeting at Hinxton this year, 5-7 July ).
 +
 +
SAB advisors will be contacted to check their availability
 +
 +
 +
== AGR SAB ==
 +
 +
Paul K
 +
Advisory board wanted us to explain AGR management structure and overall objectives better. 
 +
 +
Paul S
 +
Will send the AGR SAB Staff Report to the group
 +
 +
In April NIH panel will decide what will happen after our 1.5 years of funding...... therefore we need a detailed implementation plan.
 +
 +
With respect to the April meeting implementation plan (1.5 years):.  This should include not only what can we get done in the next 1.5 years (detailed), but include some info of longer term plans and challenges we think we will face. This sketch needs vision of the 5 year plan showing the cohesion of the AGR group members (common infrastructure and common curation efforts).
 +
 +
Working Group Updates for 1.5 year plan:
 +
The following gave perspectives/plans for the working groups on which they sit.
 +
 +
 +
Chris G: Interactions
 +
 +
Daniella R: Gene Exprression
 +
 +
Ranjana: Gene descriptions
 +
 +
Chris G: Disease and Phenotype
 +
 +
Kevin H: Orthology:
 +
This group has achieved the goals in its original mandate.  Will wind down and perhaps a group can move on to pralogs
 +
 +
Adam W: Said to let the architecture working group know if your working group needs assistance with infrastructure plans.
 +
 +
Paul S: Outside the working groups – think more about community Curation. Lynn Crosby from FlyBase has interest in heading up a working group dealing with community curation.

Revision as of 19:27, 1 March 2018

Agenda

WormBase SAB

  • Decide on date for SAB meeting

https://doodle.com/poll/vf9zb2ntvxdb7s7k

AGR SAB

  • Anything we need to know?

Open Tickets


Minutes

SAB Meeting Date

Best dates for the meeting are July 12th-13th 2018 in Toronto. (there is a Caenorhabditis evolution meeting at Hinxton this year, 5-7 July ).

SAB advisors will be contacted to check their availability


AGR SAB

Paul K Advisory board wanted us to explain AGR management structure and overall objectives better.

Paul S Will send the AGR SAB Staff Report to the group

In April NIH panel will decide what will happen after our 1.5 years of funding...... therefore we need a detailed implementation plan.

With respect to the April meeting implementation plan (1.5 years):. This should include not only what can we get done in the next 1.5 years (detailed), but include some info of longer term plans and challenges we think we will face. This sketch needs vision of the 5 year plan showing the cohesion of the AGR group members (common infrastructure and common curation efforts).

Working Group Updates for 1.5 year plan: The following gave perspectives/plans for the working groups on which they sit.


Chris G: Interactions

Daniella R: Gene Exprression

Ranjana: Gene descriptions

Chris G: Disease and Phenotype

Kevin H: Orthology: This group has achieved the goals in its original mandate. Will wind down and perhaps a group can move on to pralogs

Adam W: Said to let the architecture working group know if your working group needs assistance with infrastructure plans.

Paul S: Outside the working groups – think more about community Curation. Lynn Crosby from FlyBase has interest in heading up a working group dealing with community curation.