Difference between revisions of "WBConfCall 2018.02.15-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 3: Line 3:
 
== WS264 Status ==
 
== WS264 Status ==
 
Heads-up:
 
Heads-up:
Incorporation of T. muris and pipeline code updates have caused delay
+
* Incorporation of T. muris and pipeline code updates have caused delay
Due: 27th Feb (Including datomic import)
+
* Due: 27th Feb (Including datomic import)
  
  

Revision as of 16:13, 15 February 2018

Agenda

WS264 Status

Heads-up:

  • Incorporation of T. muris and pipeline code updates have caused delay
  • Due: 27th Feb (Including datomic import)


JBrowse update

  • New EST glyph (grouping paired reads. Example)
  • New CDS/Frame usage glyph along with color coded translations in the reference sequence. Example
  • External sources section with CeNDR variation data and CRISPR sgRNA predictions from the Moerman Lab

Open Tickets

Minutes