Difference between revisions of "WBConfCall 2017-05-18-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchSchindelman (talk | contribs) |
Schindelman (talk | contribs) |
||
Line 1: | Line 1: | ||
=Agenda= | =Agenda= | ||
− | == Release Schedule == | + | === Release Schedule === |
Since the international worm meeting is at the end of june (21 -25th) - just checking in to make sure we dont need to change the release schedule. | Since the international worm meeting is at the end of june (21 -25th) - just checking in to make sure we dont need to change the release schedule. | ||
Line 9: | Line 9: | ||
=Minutes= | =Minutes= | ||
− | == Release Schedule == | + | === Release Schedule === |
* Will keep current schedule for now (dates flexible is necessary) | * Will keep current schedule for now (dates flexible is necessary) | ||
− | == Progress Report - AGR == | + | === Progress Report - AGR === |
* Paul is collating updates from the independent sites and working groups (~two paragraphs/working group) | * Paul is collating updates from the independent sites and working groups (~two paragraphs/working group) | ||
− | == Brief Grant Update == | + | === Brief Grant Update === |
* Will find out more in June about the format, but it looks like it may go back to the ~30 page format..stay tuned | * Will find out more in June about the format, but it looks like it may go back to the ~30 page format..stay tuned | ||
− | == Brief Worm Meeting Update == | + | === Brief Worm Meeting Update === |
* We have a full slot at the plenary session (8-10 min) | * We have a full slot at the plenary session (8-10 min) |
Revision as of 16:09, 18 May 2017
Contents
Agenda
Release Schedule
Since the international worm meeting is at the end of june (21 -25th) - just checking in to make sure we dont need to change the release schedule.
Data freeze/upload is set for 6/30:
- http://www.wormbase.org/about/release_schedule#0--10 (also on the build schedule WB calendar)
Minutes
Release Schedule
- Will keep current schedule for now (dates flexible is necessary)
Progress Report - AGR
- Paul is collating updates from the independent sites and working groups (~two paragraphs/working group)
Brief Grant Update
- Will find out more in June about the format, but it looks like it may go back to the ~30 page format..stay tuned
Brief Worm Meeting Update
- We have a full slot at the plenary session (8-10 min)