Difference between revisions of "WBConfCall 2017-05-18-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchSchindelman (talk | contribs) |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=Agenda= | =Agenda= | ||
− | == Release Schedule == | + | === Release Schedule === |
Since the international worm meeting is at the end of june (21 -25th) - just checking in to make sure we dont need to change the release schedule. | Since the international worm meeting is at the end of june (21 -25th) - just checking in to make sure we dont need to change the release schedule. | ||
Line 6: | Line 6: | ||
* http://www.wormbase.org/about/release_schedule#0--10 (also on the build schedule WB calendar) | * http://www.wormbase.org/about/release_schedule#0--10 (also on the build schedule WB calendar) | ||
− | |||
+ | =Minutes= | ||
+ | === Release Schedule === | ||
+ | * Will keep current schedule for now (dates flexible is necessary) | ||
+ | |||
+ | |||
+ | === Progress Report - AGR === | ||
+ | * Paul is collating updates from the independent sites and working groups (~two paragraphs/working group) | ||
− | = | + | |
− | == | + | === Brief Grant Update === |
− | == | + | * Will find out more in June about the format, but it looks like it may go back to the ~30 page format..stay tuned |
+ | |||
+ | |||
+ | === Brief Worm Meeting Update === | ||
+ | * We have a full slot at the plenary session (8-10 min) | ||
+ | * Paul S will present |
Latest revision as of 16:35, 18 May 2017
Contents
Agenda
Release Schedule
Since the international worm meeting is at the end of june (21 -25th) - just checking in to make sure we dont need to change the release schedule.
Data freeze/upload is set for 6/30:
- http://www.wormbase.org/about/release_schedule#0--10 (also on the build schedule WB calendar)
Minutes
Release Schedule
- Will keep current schedule for now (dates flexible is necessary)
Progress Report - AGR
- Paul is collating updates from the independent sites and working groups (~two paragraphs/working group)
Brief Grant Update
- Will find out more in June about the format, but it looks like it may go back to the ~30 page format..stay tuned
Brief Worm Meeting Update
- We have a full slot at the plenary session (8-10 min)
- Paul S will present