Difference between revisions of "WBConfCall 2014.01.09-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchm (→Agenda) |
m (→Gene_clusters) |
||
Line 3: | Line 3: | ||
==Models== | ==Models== | ||
===Gene_clusters=== | ===Gene_clusters=== | ||
− | Theses changes to the ?Gene_cluster, ?Analysis, and ?WBProcess models are meant to allow the incorporation of phylogenetic profile-based gene clusters created by | + | Theses changes to the ?Gene_cluster, ?Analysis, and ?WBProcess models are meant to allow the incorporation of phylogenetic profile-based gene clusters created by <br> |
1. Yuval Tabach et al., 2013 (WBPaper00041947) and <br> | 1. Yuval Tabach et al., 2013 (WBPaper00041947) and <br> | ||
2. Michael Paulini (using all WB nematode species)<br> | 2. Michael Paulini (using all WB nematode species)<br> | ||
The proposed model changes are outlined on this google doc:<br> | The proposed model changes are outlined on this google doc:<br> | ||
https://docs.google.com/a/wormbase.org/document/d/1Hpjg6AwKeF5jFcCsuwb1Gy6_dj8gTPVj-_Ax1D4Vb-U/edit?usp=sharing<br> | https://docs.google.com/a/wormbase.org/document/d/1Hpjg6AwKeF5jFcCsuwb1Gy6_dj8gTPVj-_Ax1D4Vb-U/edit?usp=sharing<br> | ||
− | Please let me know if you cannot access it. | + | Please let me know if you cannot access it. |
===Construct/Variation Models=== | ===Construct/Variation Models=== |
Revision as of 02:50, 9 January 2014
Contents
Agenda
Models
Gene_clusters
Theses changes to the ?Gene_cluster, ?Analysis, and ?WBProcess models are meant to allow the incorporation of phylogenetic profile-based gene clusters created by
1. Yuval Tabach et al., 2013 (WBPaper00041947) and
2. Michael Paulini (using all WB nematode species)
The proposed model changes are outlined on this google doc:
https://docs.google.com/a/wormbase.org/document/d/1Hpjg6AwKeF5jFcCsuwb1Gy6_dj8gTPVj-_Ax1D4Vb-U/edit?usp=sharing
Please let me know if you cannot access it.
Construct/Variation Models
We are still working on this, perhaps we can propose it within the 9-14th timeframe?
Apologies for Absence
WS242 schedule proposal
Date | Phase |
9th - 14th Jan | Model proposals |
15th - 22nd Jan | Models Development/Incorporation |
23rd - 30th Jan | Upload Preparation |
31st Jan | Upload |
3rd Feb | WS242 Build Starts |
Outstanding Help Desk Issues
Current officer (2014-01-06) James Done