Difference between revisions of "WBConfCall 2013.03.21-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
Line 5: Line 5:
  
 
* Caltech find it hard to check data:
 
* Caltech find it hard to check data:
 
 
** Currently only a week between models tagging (Hinxton) and upload.
 
** Currently only a week between models tagging (Hinxton) and upload.
 
** Big model changes/multiple model changes cause problems
 
** Big model changes/multiple model changes cause problems
 
** Encountered lots of problem for WS237
 
** Encountered lots of problem for WS237
 
 
* Propose that model changes can be finalized one month before the data upload.
 
* Propose that model changes can be finalized one month before the data upload.
 
  
 
=Minutes=
 
=Minutes=

Revision as of 13:26, 21 March 2013

Agenda

Deadline for model changes (Wen)

  • Caltech find it hard to check data:
    • Currently only a week between models tagging (Hinxton) and upload.
    • Big model changes/multiple model changes cause problems
    • Encountered lots of problem for WS237
  • Propose that model changes can be finalized one month before the data upload.

Minutes