Difference between revisions of "WBConfCall 2013.03.21-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchLine 5: | Line 5: | ||
* Caltech find it hard to check data: | * Caltech find it hard to check data: | ||
− | |||
** Currently only a week between models tagging (Hinxton) and upload. | ** Currently only a week between models tagging (Hinxton) and upload. | ||
** Big model changes/multiple model changes cause problems | ** Big model changes/multiple model changes cause problems | ||
** Encountered lots of problem for WS237 | ** Encountered lots of problem for WS237 | ||
− | |||
* Propose that model changes can be finalized one month before the data upload. | * Propose that model changes can be finalized one month before the data upload. | ||
− | |||
=Minutes= | =Minutes= |
Revision as of 13:26, 21 March 2013
Agenda
Deadline for model changes (Wen)
- Caltech find it hard to check data:
- Currently only a week between models tagging (Hinxton) and upload.
- Big model changes/multiple model changes cause problems
- Encountered lots of problem for WS237
- Propose that model changes can be finalized one month before the data upload.