Difference between revisions of "WBConfCall 2012.03.01-Agenda and Minutes"

From WormBaseWiki
Jump to navigationJump to search
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
 
(Short meeting)
 
(Short meeting)
  
Wash U have significantly change their database processing pipeline.
+
1) Wash U have significantly change their database processing pipeline.
  
 
*Wash U switching how they build their database, to be similar to EBI
 
*Wash U switching how they build their database, to be similar to EBI
  
 
*Update stripped down version of STLACE every build.
 
*Update stripped down version of STLACE every build.
      Previously the existing database was scrapped and a new stlace database was extracted from the main WS release.
+
**Previously the existing database was scrapped and a new stlace database was extracted from the main WS release.

Latest revision as of 14:18, 6 March 2012

March 1, 2012

Apologies from EBI team for absence.

(Short meeting)

1) Wash U have significantly change their database processing pipeline.

  • Wash U switching how they build their database, to be similar to EBI
  • Update stripped down version of STLACE every build.
    • Previously the existing database was scrapped and a new stlace database was extracted from the main WS release.