Difference between revisions of "Issues-11/5/2013"

From WormBaseWiki
Jump to navigationJump to search
(Summary of R visualization progress.)
(Summary of WormMine WS239-2 build progress.)
Line 12: Line 12:
  
 
== Intermine ==
 
== Intermine ==
 +
 +
* WS239-2 build finished
 +
* made space on production and loaded build into its own database
 +
* '''have not''' fired up an InterMine instance on that data yet
 +
* summary of time/space requirements summarized at http://wiki.wormbase.org/index.php/Website:WormMine_Builds
  
 
= Abby =
 
= Abby =

Revision as of 15:39, 5 November 2013

All meetings: WebDev Issues Meetings

Status updates

Joachim

Data Visualization - R

  • stable implementation; merging with staging
  • leaving no clutter: tmp files are properly cleared, keeps directory with previously generated images
  • grouping by projects which removes need for color usage and provides better overview across projects
  • image height is adjusted based on number of projects

Intermine

Abby

Search (Xapian)

  • Don't always shorten species to g_species - if not recognized, shorten to genus_species
    • disambiguation between all the different c_elegans.
    • #1795
  • added more info to RNAi

Mobile Site

Issues