Difference between revisions of "WebDev 2011.04.20-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchLine 11: | Line 11: | ||
== 3. Testing Progress (Adrian; 10 minutes) == | == 3. Testing Progress (Adrian; 10 minutes) == | ||
+ | |||
+ | * set up a testing db | ||
+ | * used tace to set-up | ||
+ | * finished test to check static pages -- WWW::View::Robot, Test::WWW::Mechanized::Catalyst | ||
+ | * next -- test REST interface; then individual tests for specifics | ||
+ | |||
== 4. UI and Search Progress (Abby; 10 minutes) == | == 4. UI and Search Progress (Abby; 10 minutes) == | ||
== 5. Open Table == | == 5. Open Table == |
Revision as of 20:46, 20 April 2011
Contents
Agendas
1. WS225 (Norie; 5 minutes)
- Staging on going. Should be completed by the weekend. Testing and documentation the rest of the week.
- Extended data staging period is great. Sanger has been able to QC data as patches keep coming in.
2. Testing and External model development progress (Norie; 10 minutes)
- Incorporated method output inspection capabilities to testing suite. Created tests for models in my charge.
- UI development really helped by Adrians tests. Fleshing out UI for Models under my name.
3. Testing Progress (Adrian; 10 minutes)
- set up a testing db
- used tace to set-up
- finished test to check static pages -- WWW::View::Robot, Test::WWW::Mechanized::Catalyst
- next -- test REST interface; then individual tests for specifics