Difference between revisions of "WebDev 2011.07.27-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchLine 18: | Line 18: | ||
:Todd: individual from U of Utah (2011.07.21) | :Todd: individual from U of Utah (2011.07.21) | ||
:Todd: individual from Yale (2011.07.22) | :Todd: individual from Yale (2011.07.22) | ||
− | : | + | :Todd: individual from UCSF (2011.07.25) |
* Benchmarking and profiling (Todd) | * Benchmarking and profiling (Todd) | ||
Line 32: | Line 32: | ||
* Central Dogma navigation element (Abby) | * Central Dogma navigation element (Abby) | ||
− | * POC Summary page searches, eg Expr Pattern (Todd) | + | * POC Summary page searches, eg Expr Pattern (Todd/Abby) |
− | * Omnipresent sequence download options ( | + | * Omnipresent sequence download options (Todd) |
* Support for wiki integration and/or in-app content management (Abby) | * Support for wiki integration and/or in-app content management (Abby) | ||
Line 41: | Line 41: | ||
:'''2011.07.20''' | :'''2011.07.20''' | ||
: WS226 generated with types for papers | : WS226 generated with types for papers | ||
+ | : Abby commited scripts; Todd will slot in to pipeline for WS227 | ||
:'''2011.07.13''' | :'''2011.07.13''' | ||
Line 65: | Line 66: | ||
* Tested and documented production architecture (Todd) | * Tested and documented production architecture (Todd) | ||
− | * User survey and link in place | + | * User survey and link in place (Todd) |
+ | :'''2011.07.27''' | ||
+ | :Small edits, mostly complete but needs to be reviewed. | ||
+ | |||
:'''2011.07.19''' | :'''2011.07.19''' | ||
: Link in place; need to review survey contents | : Link in place; need to review survey contents | ||
* Heterogeneous caching (Todd) | * Heterogeneous caching (Todd) | ||
+ | :'''2011.07.27''' | ||
+ | : conflict when multiple caches present | ||
+ | |||
:'''2011.07.13''' | :'''2011.07.13''' | ||
: in testing | : in testing | ||
Line 76: | Line 83: | ||
* Auth/Auth, Facebook login (Todd: SSL; Abby: Facebook not required for beta launch) | * Auth/Auth, Facebook login (Todd: SSL; Abby: Facebook not required for beta launch) | ||
+ | :'''2011.07.27''' | ||
+ | : Todd added Facebook and Twitter linking | ||
+ | : Need to test | ||
* matrix of user roles and capabilities: admin, curator, operator, editor | * matrix of user roles and capabilities: admin, curator, operator, editor |
Revision as of 19:36, 27 July 2011
Contents
Agenda
Administrative Update (Todd; 5 minutes)
- WS226 rollout Friday
BioMart status (5 minutes)
Review public beta milestones (All; 10 minutes)
Copied and pasted here from the original July 6th conference call notes
Release target: on or before 9/1/2011
- Six (group or individual) focus group tests
- 2011.07.20
- Abby: two from UofT (2011.07.19)
- Todd: individual from U of Utah (2011.07.21)
- Todd: individual from Yale (2011.07.22)
- Todd: individual from UCSF (2011.07.25)
- Benchmarking and profiling (Todd)
- Model development support for flat file queries (Norie)
- View development in support of model changes: ontology, orthology, disease (Norie)
- Error trapping and logging (Todd; Abby)
- Central Dogma navigation element (Abby)
- POC Summary page searches, eg Expr Pattern (Todd/Abby)
- Omnipresent sequence download options (Todd)
- Support for wiki integration and/or in-app content management (Abby)
- Automation of Xapian db
- 2011.07.20
- WS226 generated with types for papers
- Abby commited scripts; Todd will slot in to pipeline for WS227
- 2011.07.13
- Abby updating build for classifying papers; will re=run for WS226
- Will pass along code to Todd for slotting in
- Documentation and boilerplate in place (all)
* Issue reporting system tested; reporting in place (Todd)
- 2011.07.13
- added severity option
- issues can be reported privately to wormbase staff
- color-coded issues by severity. Kinda ugly.
- tested role-specific UI elements: admins can delete; curators can be assigned; admins * curators can see private issues.
- issues still tied to pages; no option exists for generic global issue
- Commenting system tested; reporting in place
* COMPLETE: Deployment strategy (Todd)
- 2011.07.13
- Formal software life cycle
- Production deployment
- Tested and documented production architecture (Todd)
- User survey and link in place (Todd)
- 2011.07.27
- Small edits, mostly complete but needs to be reviewed.
- 2011.07.19
- Link in place; need to review survey contents
- Heterogeneous caching (Todd)
- 2011.07.27
- conflict when multiple caches present
- 2011.07.13
- in testing
- Portals? (Abby)
- Auth/Auth, Facebook login (Todd: SSL; Abby: Facebook not required for beta launch)
- 2011.07.27
- Todd added Facebook and Twitter linking
- Need to test
- matrix of user roles and capabilities: admin, curator, operator, editor
- admins: curator + delete issues
- curators: be assigned issues
- Retire (most) sidebar-free pages. They should ALL have the sidebar.
- User list UI, enable admins to promote users
- Schema review