Difference between revisions of "WebDev 2011.07.13-Agenda and Minutes"
From WormBaseWiki
Jump to navigationJump to searchLine 5: | Line 5: | ||
== Steps for hiring out graphic design assistance == | == Steps for hiring out graphic design assistance == | ||
− | == Usability | + | == Usability testing scheduling update (Todd; 5 minutes) == |
+ | |||
+ | https://spreadsheets.google.com/a/wormbase.org/spreadsheet/ccc?key=0Aj0AS0c7xC1VdGZSQnlvdTBlbUpPRWJVYlE4Tk9WRlE&hl=en_US | ||
== Review public beta milestones (All; 10 minutes) == | == Review public beta milestones (All; 10 minutes) == |
Revision as of 18:47, 13 July 2011
Contents
Agenda
Administrative Update (Todd; 5 minutes)
Steps for hiring out graphic design assistance
Usability testing scheduling update (Todd; 5 minutes)
Review public beta milestones (All; 10 minutes)
Copied and pasted here from the original July 6th conference call notes
Release target: on or before 9/1/2011
- Six (group or individual) focus group tests
- Benchmarking and profiling (Todd)
- Model development support for flat file queries (Norie)
- View development in support of model changes: ontology, orthology, disease (Norie)
- Error trapping and logging (Todd; Abby)
- Central Dogma navigation element (Abby)
- POC Summary page searches, eg Expr Pattern (Todd)
- Omnipresent sequence download options (Abby)
- Support for wiki integration and/or in-app content management (Abby)
- Automation (Todd) of Xapian db
- Documentation and boilerplate in place (all)
- Issue / commenting system tested; reporting in place (all)
* Deployment strategy (Todd)
- Heterogeneous caching (Todd)
- Portals? (Abby)
- Auth/Auth, Facebook login (Todd: SSL; Abby: Facebook not required for beta launch)