WebDev 2010.02.24-Agenda and Minutes
From WormBaseWiki
Jump to navigationJump to searchContents
Agenda
1. Administration Update (Todd; 10 minutes)
- WS210
- GFF3
- GB2
- WS211
2. Database Connectivity overview (Xiaoqi; 10 minutes)
http://www.wormbase.org/wiki/index.php/Design_Specs:_Database_Connectivity
- update on database connectivity
- used Moose method around to set up persistent connections
- upgraded some methods
- ping methods
3. Update on configuration (Abby; 10 minutes)
- Converting to .ini format
- configuration will include db information
- discussion on organization of config files
4. Development pipeline status (Norie; 10 minutes)
- upgrade to ortholog_other
- check with Michael Paulini re: interpolate_pmap2gmap.pl
- other activities: Ontology search
- coordinate with XS on API work
- script GFF db pull
5. WormMart installation / update (all; 10 minutes)
- AC to help TH with WormMart install
- TH to take care of web items
6. Open Table
- Next week's schedule -- no Monday call;
- cisortho - XS to look into this
- AC poster ready
- LS: GB2 problems? TH: some misconfigs, modEncode data(?)