WebDev 2010.02.24-Agenda and Minutes

From WormBaseWiki
Jump to navigationJump to search

Agenda

1. Administration Update (Todd; 10 minutes)

  • WS210
  • GFF3
  • GB2
  • WS211

2. Database Connectivity overview (Xiaoqi; 10 minutes)

http://www.wormbase.org/wiki/index.php/Design_Specs:_Database_Connectivity
  • update on database connectivity
  • used Moose method around to set up persistent connections
  • upgraded some methods
  • ping methods

3. Update on configuration (Abby; 10 minutes)

  • Converting to .ini format
  • configuration will include db information
  • discussion on organization of config files

4. Development pipeline status (Norie; 10 minutes)

  • upgrade to ortholog_other
  • check with Michael Paulini re: interpolate_pmap2gmap.pl
  • other activities: Ontology search
  • coordinate with XS on API work
  • script GFF db pull

5. WormMart installation / update (all; 10 minutes)

  • AC to help TH with WormMart install
  • TH to take care of web items

6. Open Table

  • Next week's schedule -- no Monday call;
  • cisortho - XS to look into this
  • AC poster ready
  • LS: GB2 problems? TH: some misconfigs, modEncode data(?)